Construction time tracking: a plain guide for contractors

Construction time tracking records three things for every worker each day: when the shift started, where each stretch of time was spent, and when it ended. Choose the method by how far your crews move in a week. A crew on one site can run on a site clock. A crew that changes sites needs a record that travels with the worker. Review exceptions daily and approve once a week.

Last updated By ZeroBadge

This is general information, not legal advice. Laws differ by state and change over time. Check the primary sources below and talk to an employment lawyer about your situation.

What should construction time tracking record?

At minimum, record who worked, when the shift started, when it ended, and where each stretch of time was spent. Federal law sets the floor: an employer must keep the hours a nonexempt worker put in each workday and the total for each workweek, and the Department of Labor's recordkeeping fact sheet says payroll records are kept at least three years and time cards two. Everything past that is what your office needs to run jobs.

Worker and day
A named person and a calendar date. Name the apprentice, not the crew, because overtime and prevailing wage rules attach to the individual.
Start and end
The time the shift began and the time it ended, as close to real time as the method allows. Times written from memory on Friday drift toward round numbers.
Location
The jobsite, the shop or the supply house each stretch was spent at. This is the field paper handles worst and the one job costing leans on hardest.
Travel
Drive time between locations during the day, kept as its own line so it can be paid and coded under whatever rule applies to you.
Breaks
Whatever your policy deducts or does not. Record the rule you actually use, not the one in the handbook.
Changes
Who edited a record, when and why. A correction with no reason attached is an argument waiting to happen.

Cost codes and phases are optional on day one. Add them when someone in the office will actually use them, which is usually when job costing starts. See construction job costing for labor for how far to take it.

Which time tracking method fits a construction crew?

The method that fits depends on how many different places a worker is in a week more than on which tool is newest. Every method records a start and an end. They differ on who has to remember something and on whether the record follows the worker.

Common ways to capture crew hours
MethodHow time is capturedWho has to actFits when
Paper sheetWritten by the worker or foremanEveryone, every dayA very small crew and a careful weekly habit
Foreman crew entryOne person enters the crew's timesThe foreman, for everyoneOne crew, one foreman who is always there
Phone appWorker taps in on a personal or company phoneEvery worker, with a charged phoneCrews that already carry company phones
Site clock or kioskA device at the site records punchesEvery worker, at the deviceOne long job with one gate
Worn badgeA company badge reports on its ownPower on, power off, chargeCrews that change sites in a week
Product-by-product detail is in construction time tracking methods compared. The phone-free case is in time tracking without phones, and site clocks in jobsite time clock alternatives.

No method is free of a weak point. A site clock cannot see the drive to the next job. An app depends on a phone the company does not own. A badge is another device to charge, assign and collect. Pick the weak point your crews can live with.

What do labor laws require of construction time records?

Federal law requires accurate hours for each nonexempt worker, overtime above 40 hours in a fixed workweek, and pay for travel between job sites during the workday. State law often adds to this, and the details differ enough that each has its own guide here. What follows is the high-level frame only.

  • Records. Hours worked each day and each week must be recorded for nonexempt employees (DOL Fact Sheet 21).
  • Overtime. Covered employees get at least one and a half times the regular rate for hours over 40 in a workweek. A workweek is a fixed, regularly recurring 168 hours, and hours cannot be averaged across weeks (DOL Fact Sheet 23).
  • Travel. Travel from job site to job site during the workday counts as hours worked, while normal travel from home to work does not (29 CFR 785.38 and 785.35).
  • Rounding. Rounding to the nearest 5 minutes, tenth or quarter hour is acceptable only when it averages out so employees are fully paid for time worked (29 CFR 785.48).

Where to go next depends on the question. Paying for drives: travel time between job sites. Daily overtime in California: California construction overtime rules. Notice and consent for location records: is it legal to GPS track employees. Public works jobs: certified payroll explained.

What does good construction time data look like?

Good time data is complete, recorded close to when it happened, attributed to a location and adds up. The last test is the quickest one to run: every minute between start and end should land in exactly one bucket.

  • Every worker who was paid has a record for the day, and every record has a start and an end.
  • Times were captured by the method, not reconstructed on Friday.
  • Each stretch of the day has a location, including the shop and the supply house.
  • Drive time shows as its own line, not folded into a job or dropped.
  • The buckets add up to the shift length, with nothing left over.
  • Every edit has an author and a reason, and the original is still there.

One journeyman's Tuesday, checked against the shift length

Shop, loading the truck
25 min
Drive to Job A
30 min
On site at Job A
195 min
Drive to the supply house
15 min
At the supply house
20 min
Drive to Job B
20 min
On site at Job B
205 min
Buckets: 25 + 30 + 195 + 15 + 20 + 20 + 205
510 min = 8h 30m

The shift ran 6:00 AM to 2:30 PM, which is 8h 30m, so nothing is unallocated. If the buckets came to 8h 05m, the missing 25 minutes is a hole to explain with the foreman, not a rounding error. The figures are illustrative.

How often should you review construction time records?

Review exceptions daily and approve once a week. A missing clock-out is easy to fix the same afternoon and hard to fix the following Monday, when the foreman has to remember which badge, sheet or phone it was.

A review rhythm for a Saturday to Friday pay period

  1. Each morning, 10 minutesClear yesterday's exceptions: a missing end time, a late start, time outside a known location. Write the reason with the fix.
  2. WednesdayCompare crew headcount by jobsite with the schedule. People moved between jobs mid-week are where hours get charged to the wrong place.
  3. FridayFinal exception pass. Anything still open gets an answer from the foreman before the weekend.
  4. Pay period closeA manager approves the week with the location breakdown in front of them, then hours go to payroll.
  5. Month endCompare hours by job against the estimate. Late is better than never, but the weekly numbers are what let you act.

The same records feed the weekly payroll process, the foreman's weekly timesheet checklist and the daily manpower report.

How do you choose a time tracking method?

Count how many different locations a typical worker touches in a week, then work down these questions in order and stop at the first yes.

  1. 1

    Does the crew stay on one site for the whole job?

    A site clock or kiosk is enough. One device covers everyone, and you can check who is at the device at the punch.

  2. 2

    Do workers already carry company phones they keep charged?

    A phone app costs the least to start. Confirm that location permission stays on and that someone owns the app rules.

  3. 3

    Is one foreman always present and reliable?

    Foreman entry works for a small crew, as long as you accept that it records when the foreman tapped, not when each worker arrived.

  4. 4

    Do workers change sites, or start at the shop and finish elsewhere?

    Pick a record that travels with the worker: an app on company phones, or a worn badge if you do not want phones involved.

  5. 5

    None of the above, and the crew is tiny?

    Paper with a weekly approval habit. Budget the office hours it takes, because the cost lands there. The hidden cost of paper timesheets shows how to measure it.

How do you roll time tracking out to a crew?

Tell crews what is recorded and why before the device shows up, start with one crew, and keep the old method running for one pay period. The people, not the software, decide whether the data is good.

How does tracked time reach job costing and payroll?

Time turns into job cost only if each hour carries a location or a code, and it turns into payroll only after someone approves it. Hours with no location can be paid, but they cannot be costed to a job without a guess.

To put a dollar figure on an hour, you need a loaded rate. How to calculate labor burden walks through it, and the labor burden calculator does the arithmetic. Splitting a day across several jobs has its own rules, covered in tracking hours at multiple job sites.

Time theft and shared punches are a separate problem with a separate fix. What buddy punching is and how it shows up covers it without turning it into an accusation.

How ZeroBadge handles this

ZeroBadge is the worn-badge method. Each worker wears a company-issued badge with its own cellular connection. Power on starts the shift and power off ends it. Every minute is classified on site, in transit or other and allocated to a jobsite, and a manager approves the week before approved hours go to your payroll provider. Nothing is installed at the site and no personal phone is involved. A badge records the badge, not who is wearing it. See construction time tracking with ZeroBadge.

Frequently asked questions

What is the simplest way to track time on a construction site?
For one crew on one site, a site clock or a careful foreman sheet is the simplest. Once workers move between jobsites, the simplest method is whichever one needs the fewest people to remember something, because every remembered step is a gap in the record.
Do I have to keep time cards for my construction crew?
Federal rules require records of hours worked each workday and each workweek for nonexempt employees. Time cards are kept at least two years and payroll records three, per DOL Fact Sheet 21. State rules can be longer. Check yours.
Is it okay to round time to the nearest quarter hour?
Federal regulations accept rounding to the nearest 5 minutes, tenth or quarter hour when it averages out so employees are paid for all the time they work. Rounding that always cuts the same direction fails that test. Some states have stricter rules.
Should drive time between jobs be on the timesheet?
Yes, as its own line. Federal rules count travel between job sites during the workday as hours worked, and the line lets you pay and code it under the rule that applies to you. See travel time between job sites.
How long does it take to switch time tracking methods?
Plan on one full pay period running both methods side by side for one crew, then a second period for the next crews. The switch itself is quick. The time goes into reconciling the two records until they agree.

Sources

  1. 1.Fact Sheet #21: Recordkeeping Requirements under the Fair Labor Standards Act · U.S. Department of Labor, Wage and Hour Division
  2. 2.Fact Sheet #23: Overtime Pay Requirements of the FLSA · U.S. Department of Labor, Wage and Hour Division
  3. 3.29 CFR 785.38, Travel that is all in the day's work · Legal Information Institute, Cornell Law School (eCFR text)
  4. 4.29 CFR 785.35, Normal travel from home to work · Legal Information Institute, Cornell Law School (eCFR text)
  5. 5.29 CFR 785.48, Use of time clocks and rounding · Legal Information Institute, Cornell Law School (eCFR text)

Get started

See ZeroBadge on your workforce.

Tell us how your crews work today. We will show you a badge-recorded week built from your own jobsites.

What we will walk through

  • 01How the badge records a shift
  • 02Your jobsites as geofences
  • 03The weekly timesheet and approval
  • 04Sending approved hours to payroll