Guide · Paper timesheets
How to switch from paper timesheets
To switch from paper timesheets, list what your sheets do today, choose a method by how often crews change sites, run it beside paper for one full pay period, compare the totals by cause and retire paper only when every difference is explained. Keep the old sheets: federal rules require payroll records for at least three years and basic time cards for two.
Last updated By ZeroBadge
This is general information, not legal advice. Laws differ by state and change over time. Check the primary sources below and talk to an employment lawyer about your situation.
What should you write down before you change anything?
Write down every job the paper sheet does today, who touches it and what breaks. A sheet is rarely only a record of hours. It is also the foreman's note that someone left early, the job code the office relies on and the signature that makes a week feel approved. If you replace the sheet without listing those jobs, one of them quietly stops happening.
Pick one finished pay period and trace it backward, from the last payroll entry to the sheet it came from. Note each handoff. The places where someone had to ask a question are the places the new method has to answer on its own.
| Field on the sheet | Who writes it now | Where it comes from after the switch |
|---|---|---|
| Worker name and date | The worker | The assigned device or login. Confirm every active worker has one before day one. |
| Start and end time | The worker, often from memory | The method's own timestamps. Decide who may correct them and with what reason. |
| Job or cost code | The worker or foreman | Location, a code picked at the time, or the foreman's end-of-day entry. This is the field most often lost. |
| Lunch | The worker | Your written deduction rule, or a recorded break. Pick one. |
| Drive and supply house time | Usually missing | A separate line or location. Paper hides this, so expect hours to appear that nobody wrote down before. |
| Notes such as "left early" or "sent home" | The foreman | A reason field on the correction. Make sure the new tool has one. |
| Foreman signature | The foreman | A weekly approval step with a named approver. |
How do you choose what replaces the paper sheet?
Choose by the failures your inventory found, not by the feature list. If crews stay on one site for the whole job, a site clock or a careful foreman sheet may be enough. If workers change sites in a week or start at the shop and finish elsewhere, you need a record that travels with the worker, and the method follows from whether you want phones involved.
- Most of the cost is office re-keying and callbacks: look at methods that produce an export, so nobody types the week again.
- Hours land on the wrong job: look at methods that record location, not only a punch.
- Workers do not carry company phones, or you do not want an app on personal ones: look at a company-issued device. See time tracking without phones.
- One long job with one gate: a site clock is fine. See jobsite time clock alternatives.
The full comparison is in time tracking methods compared, and the decision order is in the construction time tracking guide. This guide assumes you have already picked.
How do you run the new method beside paper?
Run both for one full pay period with one crew, keep paying from paper, and compare the two totals worker by worker. Neither record is trusted yet. The point of the run is to explain every difference by a cause, not to prove one side right.
- 1
Pick one crew with a reliable foreman
A crew that moves between two or three locations tests the method harder than a crew on one site, which is why it is worth starting there.
- 2
Tell the crew what is changing and what is not
Pay still comes from the sheet this period. Say so, or people will worry that the new record is already deciding their check.
- 3
Collect both records for the same dates
Same workers, same Saturday to Friday week. Do not let anyone tidy the paper to match the new record.
- 4
Compare per worker, then tag each difference with a cause
Rounding on paper, a sheet written from memory, a drive nobody recorded, a device off or charged late, a real disagreement. Untagged differences are the ones to chase.
- 5
Fix the cause, not the number
A device that was off at start is a process problem. A sheet that was long is a record to correct. Different fixes.
One week, a 12-worker crew, compared by cause (illustrative numbers)
- Paper total for the week
- 478.50 h
- New record total for the same week
- 471.25 h
- Paper is higher by
- 478.50 − 471.25 = 7.25 h
- Cause: start and end times rounded up to the half hour
- 4.75 h
- Cause: Thursday sheet written from memory, one worker
- 1.50 h
- Cause: a badge or phone was off for the first stretch of one shift
- 1.00 h
- 4.75 + 1.50 + 1.00
- 7.25 h explained, 0.00 h unexplained
6.25 h of the gap is paper running long. The other 1.00 h is a gap in the new record, and the fix is a start-of-shift habit, not an edit. Only when no hours are left unexplained for a full period is the new record ready to pay from.
How long should you keep the old paper sheets?
Keep payroll records at least three years and basic time cards at least two, which is the federal minimum, and longer where your state, a contract or a union fund requires it. The Department of Labor's own summary puts the same two periods in Fact Sheet 21, and the rules sit in 29 CFR part 516.
| Record | Federal minimum | Rule |
|---|---|---|
| Payroll records holding the required data, including hours worked each workday and each workweek, the regular rate, overtime premium and wages paid | At least 3 years from the last date of entry | 29 CFR 516.5(a) and 516.2 |
| Basic time and earning cards or sheets showing daily starting and stopping times | At least 2 years from the date of last entry | 29 CFR 516.6(a)(1) |
| Tables or schedules of the rates used to compute straight-time pay | At least 2 years from their last effective date | 29 CFR 516.6(a)(2) |
| Records kept at a central office instead of the worksite | Must be available within 72 hours of notice from the Wage and Hour Administrator | 29 CFR 516.7 |
Because the sheet shows starting and stopping times and also feeds payroll, a sensible rule is to treat every old sheet as a payroll record and keep it at least three years. The Fair Labor Standards Act requires no particular form for the records (Fact Sheet 21), so a system record can replace paper going forward. Whether a scan can stand in for a paper original in your state is a question for counsel or your accountant.
How do you retire paper for good?
Pick a date, tell everyone, stop printing sheets and keep a short written fallback for the day the new method fails. Retiring paper means no sheet is the record any more. It does not mean there is never a backup.
- Set the last paper pay period and announce it to every crew and foreman at least a week ahead.
- Stop stocking blank sheets on trucks and in the shop. A pad in a glovebox becomes the real record.
- Write the fallback: write times down only for a dead battery or no signal, the foreman signs it, and the office enters it the same day.
- Box the final paper periods by month, label the boxes with the destruction date and put them where the office can reach them within 72 hours.
- Update the handbook and any offer-letter language that mentions a paper timesheet.
- Name the person who owns corrections. Nothing is silently edited, and every change carries a reason.
- Review exceptions daily for the first month, then weekly. Watch whether the count falls week over week.
What goes wrong when a contractor switches?
Most failed switches lose a job the sheet was quietly doing, or skip the crew conversation. The software is rarely the cause.
| Problem | How it shows up | Fix |
|---|---|---|
| Cost codes dropped | The week is right and every job report is wrong | List the code step in the inventory and give it an owner before day one |
| No crew conversation | Workers assume the record is used to discipline them | Say what is recorded, when and who sees it. See rolling out time tracking to crews |
| Everyone switched at once | Ten problems at the same time and no baseline | One crew, one pay period, then the next crew |
| Paper kept as a quiet backup | Two records that disagree and no rule for which wins | A written fallback rule and a retire date |
| Parallel run never ends | The office keys both forever | Set the gate in advance: no unexplained hours for one full period |
How ZeroBadge handles this
ZeroBadge replaces the sheet with a company-issued badge: power on starts the shift, power off ends it, and every minute is classified on site, in transit or other and allocated to a jobsite. The office reviews exceptions and approves the week, and approved hours go to your payroll provider. Corrections keep an audit trail, and the weekly PDF is kept as an unchangeable version. The badge-specific 30-day plan is on replace paper timesheets.
Frequently asked questions
Is it legal to stop using paper timesheets?
How long should the parallel run last?
Do I have to keep the old paper sheets after I switch?
Should I switch every crew at the same time?
What if the new record shows people were underpaid on paper?
Sources
- 1.Fact Sheet #21: Recordkeeping Requirements under the Fair Labor Standards Act · U.S. Department of Labor, Wage and Hour Division
- 2.29 CFR 516.2, Employees subject to minimum wage or minimum wage and overtime provisions · Legal Information Institute, Cornell Law School (eCFR text)
- 3.29 CFR 516.5, Records to be preserved 3 years · Legal Information Institute, Cornell Law School (eCFR text)
- 4.29 CFR 516.6, Records to be preserved 2 years · Legal Information Institute, Cornell Law School (eCFR text)
- 5.29 CFR 516.7, Place for keeping records and their availability for inspection · Legal Information Institute, Cornell Law School (eCFR text)
- 6.29 CFR 785.48, Use of time clocks and rounding practices · Legal Information Institute, Cornell Law School (eCFR text)
Keep reading
- SolutionReplace paper timesheetsTimesheets built from the badge record, so the office stops re-keying the week.
- GuideThe hidden cost of paper timesheetsA way to put a dollar figure on re-keying, callbacks and wrong-job hours before you decide.
- GuideRolling out time tracking to crewsWhat to tell workers, how to run a pilot and what to say on day one.
- CompareTime tracking methods comparedEight ways to capture crew hours and which crew each one fits.
- ToolConstruction timesheet templateA paper or spreadsheet sheet to use for the parallel run or as the written fallback.
- GuideConstruction time tracking guideWhat to record and how to choose a method.