Guide · Wage and hour
California construction overtime rules
Under California's Wage Order 16, nonexempt construction workers earn 1.5 times their regular rate for hours over 8 in a workday, hours over 40 in a workweek and the first 8 hours on the seventh consecutive day of work, and double time past 12 hours in a day or past 8 on that seventh day. A ratified alternative workweek allows up to 10 hours a day, and qualifying union agreements are exempt.
Last updated By ZeroBadge
This is general information, not legal advice. Laws differ by state and change over time. Check the primary sources below and talk to an employment lawyer about your situation.
What are the overtime rules for California construction workers?
California counts overtime by the day as well as the week. Section 3(A) of IWC Wage Order 16, which covers on-site construction, drilling, logging and mining, sets the same rules as Labor Code section 510. Federal law only requires overtime past 40 hours in a workweek (29 U.S.C. 207(a)(1)), so California's daily rules are where most construction payroll errors come from.
| Hours | Rate | Federal FLSA for comparison |
|---|---|---|
| First 8 hours in a workday | Regular rate | Regular rate |
| Hours 9 to 12 in a workday | 1.5 times the regular rate | Regular, unless over 40 for the week |
| Over 12 hours in a workday | 2 times the regular rate | Regular, unless over 40 for the week |
| Over 40 hours in a workweek (not already daily overtime) | 1.5 times the regular rate | 1.5 times the regular rate |
| First 8 hours on the seventh consecutive day of work in a workweek | 1.5 times the regular rate | No special rule |
| Over 8 hours on that seventh day | 2 times the regular rate | No special rule |
The California Labor Commissioner's overtime FAQ states the same rules and adds that overtime is calculated on hours actually worked. Paid holidays and other paid time not worked do not count toward it.
Who does Wage Order 16 cover?
Everyone employed in on-site construction occupations, unless an exemption applies. Wage Order 16 section 2(C) defines construction occupations as all job classifications associated with construction, including alteration, demolition, building, excavation, renovation, remodeling, maintenance, improvement and repair work, and work that requires a contractor's license under Business and Professions Code section 7025 and following.
- Administrative, executive and professional employees are outside sections 3 to 11 if they meet the duties test and earn a monthly salary of at least twice the state minimum wage for full-time work (section 1(A)).
- Public employees of the state, a city, county or special district are outside most of the order (section 1(B)).
- Office staff. Wage Order 16 covers on-site occupations, so office employees who never work on site may fall under a different wage order. Check which order fits each job before you set up payroll.
- Union members may be exempt from the overtime sections under a qualifying agreement. See the union section below.
How do the workweek and the seventh-day rule work?
The seventh-day premium applies only when an employee works all seven days of one fixed workweek. Wage Order 16 section 2(T) defines the workweek as any seven consecutive days starting on the same calendar day each week, a fixed and regularly recurring period of 168 hours. Section 2(S) defines a workday as any consecutive 24-hour period starting at the same time each calendar day.
- Your workweek start matters. Read literally, seven straight days that straddle two of your workweeks do not include a seventh consecutive day of work in either week, so the day-seven premium does not apply, though daily and weekly overtime still do. Set the workweek in writing and keep it.
- Shutdowns and long pours. Section 3(G) lets days of rest accumulate when the work reasonably requires seven or more consecutive days, as long as the employee gets the equivalent of one day's rest in seven each calendar month.
- The 72-hour line. Section 3(E) bars firing or disciplining an employee for refusing to work more than 72 hours in a workweek, except in an emergency as defined in section 2(F).
How do daily and weekly overtime combine?
They do not stack. An hour already paid as daily overtime does not count again toward the 40 hours for weekly overtime. The Labor Commissioner's office explained this in its 1999 AB 60 memo: there is no pyramiding of separate forms of overtime for the same hours. Section 3(D) of the order and Labor Code 510 likewise say nothing requires combining more than one overtime rate for an hour.
So the order of work matters. Count regular hours day by day; once regular hours for the week reach 40, any later hour that would have been regular becomes overtime.
Week A: four 10-hour days with no alternative workweek, $38.00 an hour
- Monday to Thursday
- 10 hours each = 8 regular + 2 overtime per day
- Regular hours
- 4 x 8 = 32 hours x $38.00 = $1,216.00
- Daily overtime
- 4 x 2 = 8 hours x $57.00 = $456.00
- Federal-only comparison
- 40 hours, all regular = $1,520.00
- California gross pay
- $1,672.00, which is $152.00 more than the federal figure
Across a 12-person crew on a 10-week job that is 12 x 10 x $152.00 = $18,240.00. A properly adopted alternative workweek (below) would make all 40 hours regular.
Week B: a seven-day shutdown, 10 hours a day, Monday-to-Sunday workweek, $40.00 an hour
- Days 1 to 5
- 8 regular + 2 overtime each = 40 regular, 10 overtime
- Day 6
- The weekly 40 regular hours are used up, so all 10 hours are overtime
- Day 7 (seventh consecutive day)
- First 8 hours overtime, last 2 hours double time
- Totals
- 40 regular, 28 overtime, 2 double time = 70 hours
- Pay
- 40 x $40.00 + 28 x $60.00 + 2 x $80.00 = $1,600.00 + $1,680.00 + $160.00
- Gross pay
- $3,440.00 (the federal weekly rule alone gives $3,400.00)
Week C: one 14-hour pour day on a standard schedule, $38.00 an hour
- Hours 1 to 8
- 8 x $38.00 = $304.00
- Hours 9 to 12
- 4 x $57.00 = $228.00
- Hours 13 and 14
- 2 x $76.00 = $152.00
- That day's pay
- $684.00 for 14 hours
Run your own week through the California overtime calculator.
How does an alternative workweek change overtime?
A ratified alternative workweek lets a crew work up to 10 hours a day within a 40-hour week without daily overtime (Wage Order 16, section 3(B)(1)(a)). Hours beyond the regularly scheduled hours, and over 40 in the week, are paid at 1.5 times. Double time applies past 12 hours in a day and past 8 hours on a day that is not one of the scheduled workdays.
- 1
Write the proposal
The employer proposes a written schedule with a fixed, regularly recurring number of workdays and hours, or a menu of options (section 3(C)(1)).
- 2
Disclose and meet
Give affected employees a written disclosure of the effects on wages, hours and benefits, and hold a noticed meeting at least 14 days before the vote, in another language too if at least 5 percent primarily speak it (section 3(C)(3)).
- 3
Hold a secret ballot
At least two-thirds of the affected employees in the work unit must approve, in a vote during working hours at the work site, with ballots mailed to absent employees employed in the last 30 days (sections 3(C)(1) and (2)).
- 4
Report and wait
Report the results to the DIR Office of the Director, Research, within 30 days and post them at the job site. Employees need not work the new hours for at least 30 days after the results are announced (sections 3(C)(7) and 3(B)(1)(e)).
A work unit is all nonexempt employees of one employer within a given craft who share a common work site (section 2(U)). Employees can petition to repeal the schedule: one-third can force a new vote after six months, and two-thirds must vote to reverse it (section 3(C)(5)). The employer may not cut the regular hourly rate because of the schedule (section 3(B)(1)(d)).
Week D: ratified 4x10 schedule (Monday to Thursday), $38.00 an hour
- Monday, Wednesday, Thursday
- 10 hours each, all regular = 30 hours
- Tuesday
- 11 hours: 10 regular + 1 overtime (beyond the scheduled 10)
- Friday, not a scheduled day
- 6 hours, all overtime (beyond scheduled hours and over 40)
- Pay
- 40 x $38.00 + 7 x $57.00 = $1,520.00 + $399.00
- Gross pay
- $1,919.00 for 47 hours
Had Friday run past 8 hours, the hours after 8 would be double time because Friday is not a scheduled workday.
Are union crews exempt from California overtime rules?
They can be. Wage Order 16 section 3(H) says the overtime and alternative workweek subsections, 3(A) to 3(E), do not apply to employees covered by a valid collective bargaining agreement that meets all of these conditions (see also Labor Code 514):
- The agreement expressly provides for the wages, hours of work and working conditions of the employees.
- It provides premium wage rates for all overtime hours worked.
- It sets a regular hourly rate of at least 30 percent more than the state minimum wage.
The 30 percent floor in 2026
- State minimum wage from January 1, 2026 (Wage Order 16, section 4)
- $16.90 an hour
- 30 percent more
- $16.90 x 1.30 = $21.97
- Lowest regular rate that can qualify
- $21.97 an hour
Check every classification on the wage sheet, starting with the lowest apprentice step.
The DLSE memo adds that "premium wage rates" means any rate above the straight-time regular rate, and that the agreement's own overtime definitions control which hours count as overtime. The makeup time rule in section 3(F) still applies to union employees unless the agreement says otherwise (section 3(H)(2)). Whether a particular agreement qualifies is a contract question for counsel.
How do makeup time and mid-day travel affect overtime?
Makeup time can keep extra hours at straight time; required travel adds to them. Under section 3(F), when an employer approves an employee's written request to make up time lost to a personal obligation in the same workweek, those hours do not count toward daily overtime unless they push the day past 11 hours or the week past 40. The employer may tell employees the option exists but may not encourage or solicit the requests.
Section 5(A) requires all employer-mandated travel after the first location where the employee must report to be paid at the regular rate, or at the overtime rate when the day or week has crossed a threshold. A 9-hour day that includes a 40-minute drive between two jobsites carries an hour of daily overtime. See travel time between job sites.
What should you check before payroll each week?
- Each employee's daily hours, not just the weekly total, including drive time between sites.
- Any day over 8 (or over the scheduled hours on an alternative workweek) and any day over 12.
- Whether anyone worked all seven days of your workweek.
- Regular hours capped at 40, counted day by day in order.
- Whether an alternative workweek was properly adopted for that work unit and is still in force.
- For union employees, whether the agreement meets section 3(H) and what its own overtime rules say.
- For public works, the prevailing wage determination and certified payroll obligations.
- Approved makeup time requests, in writing, for the same workweek.
How ZeroBadge handles this
Daily overtime needs daily hours you can trust. ZeroBadge records each worker's shift from power on to power off on a company badge and classifies every minute as on site, in transit or other, allocated to a jobsite, so a drive between sites is part of the day instead of a gap. Weekly timesheets run Saturday to Friday by default, and the exceptions list shows missing clock-outs, late starts and early finishes before anyone approves the week.
Approved hours are sent to your payroll provider, or exported as CSV, Excel or PDF, where California's overtime rules are applied. ZeroBadge does not decide which rule or exemption applies to your crews. See overtime tracking.
Frequently asked questions
Does a 4x10 schedule mean daily overtime in California?
Is Saturday overtime in California construction?
Do union agreements override California overtime law?
Does drive time between jobsites count toward daily overtime?
Can an employee waive overtime by agreeing to a schedule informally?
Sources
- 1.IWC Order 16-2001, certain on-site occupations in the construction, drilling, logging and mining industries (as amended, effective January 1, 2026) · California Department of Industrial Relations
- 2.California Labor Code section 510, Eight-hour workday and overtime · California Legislative Information
- 3.Overtime frequently asked questions · California Division of Labor Standards Enforcement
- 4.Understanding AB 60: an in-depth look at the Eight Hour Day Restoration and Workplace Flexibility Act of 1999 (Dec. 23, 1999) · California Division of Labor Standards Enforcement
- 5.29 U.S.C. 207, Maximum hours (Fair Labor Standards Act overtime) · U.S. Code (Legal Information Institute, Cornell Law School)
Keep reading
- ToolCalifornia overtime calculatorEnter a week day by day and see regular, overtime and double time.
- GuideTravel time between job sitesWhen drive time is hours worked, and how it pushes a day past 8.
- SolutionOvertime trackingDaily and weekly hours by worker before the week is approved.
- GuideCertified payroll explainedDavis-Bacon weekly payrolls for public works jobs.
- IndustryUnion contractor time trackingHours by worker and jobsite for remittance reports and audits.
