Glossary · Job costing
Cost codes
Cost codes are short codes a contractor attaches to hours and expenses to show what kind of work they belong to, such as rough-in, trim or demolition. Each job gets its own list of codes so the actual cost of each part of the work can be compared with its estimate.
Last updated
How are cost codes built?
Cost codes are usually built as a job number plus a phase or scope code, and sometimes a cost type. Many contractors base the scope part on the MasterFormat division numbers used in specifications, then trim or extend the list to fit how they estimate.
| Part | Example | Meaning |
|---|---|---|
| Job | 2417 | The project, such as a school renovation |
| Scope code | 26 05 00 | Electrical, common work results |
| Cost type | L | Labor (other letters can mean material, equipment or subcontractor) |
What does a cost code do for a crew on a jobsite?
A cost code tells the office where a crew's hours went. A foreman who splits a day between pulling wire and setting boxes can have those hours land on two scope lines instead of one lump.
One day, three codes
- 6:30 AM to 10:00 AMRough-in, third floor: 3.5 hours coded to rough-in.
- 10:00 AM to 12:00 PMTemporary power: 2.0 hours coded to temp power.
- 12:30 PM to 2:30 PMRough-in, third floor: 2.0 hours coded to rough-in.
Frequently asked questions
How many cost codes should a job have?
Are cost codes the same as MasterFormat?
Can a badge assign cost codes automatically?
Sources
- 1.MasterFormat, standards overview · Construction Specifications Institute