
Roofing contractor time tracking
Roofing contractor time tracking when the weather decides how long the day is.
Roofing contractor time tracking has to survive a day that can end at ten in the morning: the crew shows up, the forecast turns, and the roof is not workable. ZeroBadge records each worker from a company-managed badge and places the day at the building you drew, so a full day, a partial day and a day spent waiting are all recorded as they happened. Tear-off and install hours stay separate by date, and service calls are counted by building.
- Partial days recorded as they happened
- Tear-off and install kept apart
- One month or more of battery life*
*Under qualifying operating conditions. Battery life varies with reporting frequency, signal conditions, usage, and configuration.
Tue Oct 6
- 6:30 AMShop & OfficeClocked in at the shop, loaded fittingsOn site · 25m
- 6:55 AMTransit to RiversideDrive to Riverside Medical PavilionTransit · 40m
- 7:35 AMRiverside Medical PavilionCrew hand-over with Marcus T.On site · 45m
- 8:20 AMTransit to Cascade SupplyDrive to Cascade Supply Co.Transit · 25m
- 8:45 AMCascade Supply Co.Vendor stop: valve pickupVendor · 25m
- 9:10 AMTransit to Harbor YardDrive to Harbor YardTransit · 30m
- 9:40 AMHarbor Yard Distribution CenterOn site with the Harbor Yard crewOn site · 6h 10m
What ZeroBadge does for you
How ZeroBadge helps commercial roofing contractors
One company badge per worker covers safety alerts, timekeeping, labor analytics and ZeroBadge AI. Here is what each part does in your line of work.
01
Worker safety
A roofer alone on a roof for a service call can press SOS, and a man down alert reaches the office if the badge stops moving for the set time.
Learn more02
Workforce management
See which crews are on which roofs and which service techs are on leak calls, and spot a late start on a day weather may cut short.
Learn more03
Automated timekeeping
A day rained off at ten is recorded as it happened, from arrival to departure, so partial days and standby are not rebuilt from memory.
Learn more04
Workforce productivity
Compare tear-off hours with install hours by date on each job and see which stretch ran over the bid while there is still roof left to finish.
Learn more05
Location analytics
GPS works on open roofs, so each arrival and departure is placed at the building you drew. It answers which building, not which section of the roof.
Learn more06
Field logistics
Plan crews across re-roofs and service calls using the record of weather days and drives, so staffing follows the roofs that are workable.
Learn more07
AI advisory and analytics
Ask how many crew hours a re-roof used before the rain stopped work and get an answer from badge records, with each number linked to the shifts.
Learn more
Safety alerts support your safety program. They do not replace supervision or training, ZeroBadge does not monitor alerts or contact 911, and in an emergency workers should call 911.
Where roofing hours hide
A roofing crew's day has two kinds of end: finished, and called.
Commercial roofs are bid by the square and sold on a dry-in date. The labor lives between those two, and the weather moves it around.
The day that stops at ten
A crew drives forty minutes, loads the roof and is told to stand down at ten. The sheet either says eight hours the crew didn't work or four hours with the standby missing, depending on who fills it in.
Waiting for a roof to dry
After rain a membrane roof has to dry before work resumes. A crew might sit on site for two hours, on the clock, with the decision still pending. That time belongs to the job and shows nowhere.
Tear-off bid like install
Tear-off is heavy, dirty and fast. Install is slow and exacting. Bid on a single rate per square, the two hide each other, and a job that runs long on tear-off can look fine because install was quick.
Material on the roof before the work
Rolls, insulation boards and fasteners are hoisted by crane or lift to the roof. That is paid labor with a specific start time, usually before the crew's first real square, and it gets rounded into the day.
Service and leak calls
A service tech visits a roof for forty minutes to find a leak, then another for a patch. These are short, billable, by building, and different from a re-roof crew's week.
Dry-in days and weekends
A storm forecast turns Saturday into a working day to get a section dried in. The extra day is on a particular job.
A weather day
A TPO re-roof, rained off before lunch.
Illustrative day for a six-person crew.
Crew sheet
- MorningThe foreman writes the whole crew in at 6:30.
- 9:40Rain starts. The crew waits in trucks for a while, then packs up.
- AfternoonThe sheet says four hours or eight, depending on how the foreman remembers the day.
- FridayThe job's hours include a partial day that nobody can reconstruct.
Badge record
- 6:30Each badge goes on as its owner reaches the building.
- 9:40Rain. The crew stays on site. The badge records that they are there.
- 11:15Badges go off as the crew leaves. 4 hours 45 minutes on site, each.
- FridayA partial day on the right job, with its real length. Your policy decides how it is paid.
What the badge records on a roof
Arrival, stay and departure. Not weather, and not squares.
A roof is outdoors, open to the sky, which is where GPS is strongest. The record is simple and honest about its limits.
A weather call
The badge doesn't know it rained. Log the weather call in your daily report. Then the report says why the day was short and the record says how long it was.
Tear-off versus install
Use your schedule for the dates each phase ran. Pull the building's hours for those dates and divide by the squares completed. The badge supplies the hours, your foreman supplies the squares.
Which section of the roof
A badge places a person at a building, not on a roof section or a deck. Roof areas are costed by date, the way floors are on an interior job.
Service calls by building
Each customer building is a location you draw. A tech's visit appears as an arrival, a stay and a departure, with the drive in between. Compare that to the ticket billed for the same call. More on short visits at several sites is on multi-jobsite time tracking.
Payroll wrinkles
Standby, partial days and storm work.
Weather standby and show-up pay
Whether a crew that arrives and is sent home, or waits for a roof to dry, is paid for that time depends on your policy, your agreement and your state's rules. The record shows how long each person was on site; your payroll provider applies the rule.
Drives out to a rural or distant job
Travel to a job a long way out is recorded as transit between the shop and the building, separate from time on the roof. How it is paid follows your policy and your state's rules.
Overtime to dry in before a storm
A weekend push is recorded on the day it happened, by building, so premium time goes against the job that needed it.
Public roofs
A school or a municipal building brings certified payroll forms. Hours are by worker, building and day, which is the shape they need. The forms stay in your payroll process; see payroll integration.
Why phones don't work on a roof
Heat, glare and a long ladder.
Sun and heat
A phone left in a pocket or on a dark membrane overheats and shuts down. A badge is made to be worn on the vest, not used.
Gloves and hot work
Torch-applied or hot-asphalt work keeps gloves on and hands busy for most of the shift. Reaching for a screen is not a step that survives.
A different roof every day
A crew that moves between buildings across a week would punch each arrival and departure on a phone, in a truck, usually from memory. The badge is switched on once at the start of the shift.
Rolling it out
Badge one re-roof crew and one service tech.
- 01
Draw the buildings
Type each active roof and the buildings your techs service. Adjust the geofences. Add the shop and the material yard.Office · first day
- 02
Badge the crew and the tech
A crew on a re-roof and a tech on a route show the two shapes of week side by side.Office · first week
- 03
Keep the weather note
When a day is called, one line in your daily report says why. The badge supplies when people arrived and left.Foreman · each call
- 04
Approve and send
Timesheets run Saturday to Friday. Clear the exceptions, approve, and approved hours are sent to your payroll provider.Payroll · weekly
Go deeper
Where roofing contractors usually look next.
- Industry guideSpecialty contractorsSmall crews on many small jobs, with shop time and drives separated, and a page for each specialty.
- Industry guideGeneral contractorsSelf-perform crews, supers across several projects and manpower by job and day.
- Industry guideConstructionGeneral and specialty contractors with crews across several jobsites, the shop and the supply house.
- SolutionLabor cost trackingLoaded rates, job budgets and forecasts from badge-recorded hours.
- SolutionMulti-jobsite time trackingSite transfers, transit and supply runs inside one shift record.
- SolutionTime tracking without phonesA company-managed badge instead of an app on a worker's personal phone.
- SolutionPayroll integrationApproved hours sent to your payroll provider automatically. Nobody re-keys a timecard.
ZeroBadge AI
Ask ZeroBadge AI about your roofing crews
Ask in your own words. ZeroBadge AI reads only your company's records and links each number to its source.
You ask
How many crew hours did the Lincoln Elementary re-roof use before the rain stopped work?
The crew logged 31 hours across two days, and Tuesday's shift ended at 10:20 AM when the badges went off. The weather note you added is shown beside it.
You ask
How do tear-off hours compare with install hours on the Hillcrest job?
Tear-off took 96 hours from Oct 6 to Oct 9 and install 142 hours from Oct 10 to Oct 17, split by the foreman's dates. Both link to the shifts.
You ask
Which service tech had the longest drives between leak calls?
One tech drove 2h 45m between seven leak calls on Thursday, 31% of a 9-hour shift. The stops are listed by building.
Answers come only from your company's own records. Every number links to the records behind it. Read-only; admins control access.
How ZeroBadge AI worksQuestions
Questions roofing contractors ask.
How do I record a roofing crew that was rained off partway through the day?
Does ZeroBadge know when it rained or when the roof was workable?
Can I separate tear-off hours from install hours?
How does it handle service and leak calls?
Is the location accurate on a large flat roof?
Last updated
Get started
See a rained-off day and a service route in one record.
We'll walk through ZeroBadge with your active roofs, your service route and the way your bids are built by the square.
What we will walk through
- 01How a partial day is recorded as it happened
- 02Tear-off and install hours against your bid by the square
- 03Weekly timesheets, review and the payroll integration