
Drywall contractor time tracking
Drywall contractor time tracking for crews of twenty, where labor is most of the bid.
Drywall contractor time tracking has to count big crews on short phases: framers lay out and stand studs, hangers cover a floor in days, finishers tape and coat in rounds with dry time between, and sanders come last. Labor is most of the bid, so an hour lost is margin lost. ZeroBadge records every worker from a company-managed badge, places the day at the building you drew, and gives the office a headcount and an hours total by building and day.
- Headcount by building and day
- Hours per phase against the bid
- One month or more of battery life*
*Under qualifying operating conditions. Battery life varies with reporting frequency, signal conditions, usage, and configuration.
Paid vs on site
Paid time · 1,045.2 h
On a jobsite 96.1%
- Jobsite
- Shop / office
- Supplier stop
- Between locations
- RiversideJobsite375.0 hOT 38.3 h · $28,070
- Harbor YardJobsite300.8 hOT 3.8 h · $20,530
- NorthgateJobsite328.9 hOT 17.6 h · $24,008
- ShopShop / office15.3 hOT 14.8 h · $1,496
- Cascade SupplySupplier stop6.2 hOT 5.8 h · $386
- Transit between locationsBetween locations19.0 hOT 15.4 h · $1,595
Loaded labor cost
$76,085
Overtime share
11.6%
OT hours at loaded rate + premium
What ZeroBadge does for you
How ZeroBadge helps drywall and framing contractors
One company badge per worker covers safety alerts, timekeeping, labor analytics and ZeroBadge AI. Here is what each part does in your line of work.
01
Worker safety
On a floor with twenty or thirty workers, anyone can press the alert button and the office sees which jobsite raised it.
Learn more02
Workforce management
See how many people are on each floor's job today against the plan, and who is late or missing before the crew falls behind.
Learn more03
Automated timekeeping
Badge on starts the day for every hanger, taper and framer without a phone, and hours stay recorded per worker even when pay is by the sheet.
Learn more04
Workforce productivity
Compare hours recorded for frame, hang, tape and finish against the bid for each project, so a phase running long shows early.
Learn more05
Location analytics
GPS outdoors and Wi-Fi inside place each worker at the project, so the record counts real crew size by day, not by floor.
Learn more06
Field logistics
Move hangers or finishers between projects using recorded hours per phase, so the crew sized for tape is not still on hanging.
Learn more07
AI advisory and analytics
Ask ZeroBadge AI how many people worked each phase of a project, and the answer links to the daily records.
Learn more
Safety alerts support your safety program. They do not replace supervision or training, ZeroBadge does not monitor alerts or contact 911, and in an emergency workers should call 911.
Where drywall hours hide
Twenty-five people on a floor produce a crew sheet that is a guess.
Drywall is bid on labor: so many hours per thousand square feet to hang, so many to finish. When a foreman is running a crew that size, the sheet at the end of the day is built from memory.
A foreman can't watch twenty-five arrivals
People come in over forty minutes. Some start with the framers, some pick up material on the way, some are sent to another floor. The sheet shows a round start time for everyone.
Floors that overlap phases
Hangers are on six while finishers coat five and framers are still laying out seven. One crew sheet for the building cannot say how many people were in which phase, so no phase has its own hours.
Dry time and return rounds
Joint compound has to dry between coats. The finishing crew leaves a floor and returns the next day for the second coat, then a third. Hours for the same floor appear over several days, and the estimate for finishing is a single number.
Backing, blocking and the work nobody priced
A change in a wall layout means opening and closing frame that was already hung. That rework lands on whatever phase is open that day.
Material handling
Board is delivered to a dock or a hoist and moved to the floor by hand. For a big job that is a labor line of its own, and it is almost never coded as one.
Punch list in the last week
Dents, patches and touch-ups after other crews are paid labor on a floor that is supposed to be finished.
A headcount you can read
How many people were here, for how many hours, on which day.
Draw the building as a jobsite. Every badge placed there that day is a person on the job, with their own arrival, departure and total. A twenty-five-person day reads as twenty-five lines, not a foreman's rounded estimate.
To split hours by phase, use the schedule you already keep. Hangers were on floors 5 and 6 from Monday to Wednesday; finishers were on 4 and 5 from Tuesday to Friday. Pull the building's hours for each group on those dates. The badge supplies who and how long. Your schedule supplies what they were doing.
Jobs
Job labor · week
$72,608
Overtime cost
$5,736
Need attention
2 of 3
Riverside Medical Pavilion
At riskBudget used 62% · work done 58%5,578 / 5,200 h (+7.3%)
This week 375.0 h · $28,070 · OT $3,683
Northgate Tower
WatchBudget used 44% · work done 44%9,702 / 9,600 h (+1.1%)
This week 328.9 h · $24,008 · OT $1,672
Harbor Yard Distribution Center
On trackBudget used 71% · work done 73%7,234 / 7,400 h (−2.2%)
This week 300.8 h · $20,530 · OT $380
Work complete, as entered · bar = budget hours used
Piece rate and hourly
Paying by the sheet doesn't remove the hours.
Many hangers are paid by the sheet or the square foot. The badge doesn't change how anyone is paid. It records the hours, which a piece-rate worker's week still needs.
Hours worked are still hours worked
A hanger paid per sheet still spends a measurable number of hours at the building. Those hours are recorded by worker, building and day so they're available for whatever your payroll rules and your state's wage rules require. Confirm the details with your payroll advisor.
Rate per hour as a cross-check
Divide a worker's piece-rate earnings by the recorded hours. It's a quick way to see whether a rate is being met or where a hanger spent time on non-piece work like moving material.
Output stays in your system
The badge doesn't count sheets hung. Your foreman's takeoff or your pay sheet supplies output; the badge supplies hours. Together they give hours per thousand square feet.
Mixed pay on one job
Hourly framers beside piece-rate hangers need no special setup. Each worker's hours are separate and your payroll provider applies the pay rule that belongs to them.
Payroll wrinkles
Public jobs, overtime pushes and crews that move up and down.
Large crews on public work
A school or a courthouse can mean twenty or thirty names a day. Hours carry each worker's name, building and date, which is the shape certified payroll preparation needs. Those forms stay in your payroll process; see payroll integration.
Manpower that swings week to week
Crews ramp up for hang and drop off for finish. A worker added midweek has a short week with no special entry; the record starts the first day their badge was on.
Overtime to hold a schedule
A Saturday push to beat a ceiling or paint start shows on that day by building, so the overtime goes against the job that required it.
Late arrivals and early departures
With a crew this size, the exceptions list shows late starts and early finishes against the schedule, so a foreman's word is not the whole record. How attendance is handled stays your policy.
Why phones don't work on drywall
Mud on the hands, dust in the air, stilts underfoot.
Wet compound and fine dust
Finishers' hands are covered in mud, and sanding fills the air and every surface with gypsum dust. A phone in a pocket takes it all, and a punch is the last thing on anyone's mind.
Stilts and ladders
Taping a ceiling on stilts or hanging overhead board takes both hands and full attention. Reaching for a phone isn't part of the job.
A crew too large to punch for
When one foreman punches in the whole crew from a list, mistakes follow. Each worker's own badge is switched on at the start of their shift.
Rolling it out
Badge a full crew on one building first.
- 01
Draw the building and the supply stop
Type the address, adjust the geofence, and add the board supplier if crews pick up material.Office · first day
- 02
Badge one whole crew
A partial crew gives a partial headcount. Put every framer, hanger and finisher on the building on badges together so the day reads completely.Office · first week
- 03
Compare hours per thousand to the bid
At the end of a phase, divide recorded hours by square feet completed and set the result next to your bid rate.Estimator · each phase
- 04
Approve and send
Timesheets run Saturday to Friday. Clear the exceptions, approve, and approved hours are sent to your payroll provider.Payroll · weekly
Go deeper
Where drywall and framing contractors usually look next.
- Industry guideSpecialty contractorsSmall crews on many small jobs, with shop time and drives separated, and a page for each specialty.
- Industry guideGeneral contractorsSelf-perform crews, supers across several projects and manpower by job and day.
- Industry guideConstructionGeneral and specialty contractors with crews across several jobsites, the shop and the supply house.
- SolutionLabor cost trackingLoaded rates, job budgets and forecasts from badge-recorded hours.
- SolutionWorkforce productivityCrew allocation, labor by project, overtime trends and weekly workforce scores.
- SolutionTime tracking without phonesA company-managed badge instead of an app on a worker's personal phone.
- SolutionPayroll integrationApproved hours sent to your payroll provider automatically. Nobody re-keys a timecard.
ZeroBadge AI
Ask about crews and phases
Answers come from your own recorded hours in plain English, every number links to its records, and ZeroBadge AI only reads, never changes.
You ask
How many hours did the hanging crew record on the Kensington Tower fourth floor?
The hanging crew recorded 412 hours across 11 days, with a peak of 31 workers on one day. The daily crew counts link to the records.
You ask
Which projects have more finishing hours than bid so far?
Kensington Tower has used 540 of 480 bid finishing hours, and Lakeside Clinic 190 of 200. Both link to the weekly hours.
You ask
What was the largest crew we had on site last Wednesday?
Kensington Tower had 29 badges on site at once on Wednesday. The time and names of everyone present are in the linked record.
Answers come only from your company's own records. Every number links to the records behind it. Read-only; admins control access.
How ZeroBadge AI worksQuestions
Questions drywall and framing contractors ask.
How do I track hours for a large drywall crew without a foreman punching everyone in?
Can it separate hang hours from finish hours?
We pay hangers by the sheet. Do we still need hours?
Does it count sheets hung or square feet finished?
What does it do for a jobsite with several floors in different phases?
Last updated
Get started
See a twenty-person floor as a real headcount and an hours total.
We'll walk through ZeroBadge with your crews, your active buildings and the way your bid is built by phase.
What we will walk through
- 01How a large crew's day reads by worker, not by foreman's list
- 02Hours per thousand square feet against your bid
- 03Weekly timesheets, review and the payroll integration