Payroll losses in field work

How much value is hidden in unclear labor hours?

There's no credible universal figure for how much contractors lose on payroll, and the percentages repeated online don't trace back to a published study. What you can work out is your own number: the hours each week that get rounded, reconstructed from memory or charged to the wrong job, multiplied by crew size and loaded labor rate. The calculator below does that arithmetic in the open.

None of this assumes anyone is doing anything wrong. Most unclear hours come from paper, memory and crews moving between sites.

  • Arithmetic you can check
  • Your inputs, not an industry average
  • Patterns, not accusations

Tue Oct 6

Paper sheet · typical entry

Harbor Yard · 6:30 AM – 4:00 PM

9.5 h

Rounded to the half hour. One job for the whole day.

Badge record · same day

  • Shop & OfficeOn site25m
  • Transit between locationsTransit1h 35m
  • Riverside Medical PavilionOn site45m
  • Cascade Supply Co.Vendor25m
  • Harbor Yard Distribution CenterOn site6h 10m

Charged to Harbor Yard beyond the record

9.5 − 6.2 = 3.3 h

0.2 h of rounding; the rest was time at other locations or between them, now on its own lines.

One foreman, one day.

The honest answer

Why there's no reliable "percent of payroll" figure for field crews.

The numbers that circulate (a share of payroll, a national dollar total) usually come from vendor blogs or from a hypothetical estimate that has since been quoted as fact. They also measure different things: rounding, data-entry errors, unpaid overtime, misallocated job costs. Your crews, sites and pay rules are your own, so the useful figure is the one you calculate from them. Errors also run both ways: unclear hours can mean someone was paid too little as well as too much.

Context: the US Department of Labor's Wage and Hour Division recovered more than $259 million in back wages for 176,957 workers across all industries in fiscal year 2025 (DOL WHD data, FY2025).

Estimate your own

Three hours a week, at your crew size and your rate.

Set two things: your field headcount and your average loaded labor cost per hour (wage plus taxes, insurance and benefits). One assumption stays fixed, 3 hours per worker per week across 50 working weeks, and the result is the labor value of those hours over a year, with the arithmetic shown.

Use it to size the question, not to book a saving. The point is to decide whether it's worth looking at your records, and where to start.

25
$45/ h

Fixed assumption

3 hours lost per worker, per week

Based on 250 working days a year (50 working weeks).

See where your crews' hours go

Labor cost of hours lost, per year

$168,750

Labor cost of hours lost per year: $168,750

25 workers × 3 h × 50 weeks × $45/h

Hours lost / week
75
Hours lost / year
3,750

Hours lost, building week by week3,750 h by week 50

That's the paid working year of about 1.9 full-time workers.

Worked arithmetic

Three crews, with the arithmetic shown.

Two cases are paid hours nobody can account for. The third is different: payroll is right, but the hours are charged to the wrong job, which is where job cost reports go quiet.

crew × minutes ÷ 60 × loaded rate × workdays

Assumed inputs
  1. AA mid-size mechanical crew

    Start and finish times rounded or written from memory

    25 people × 12 min ÷ 60 = 5 h a day × $45/h = $225 a day × 240 days

    $54,000a year · 1,200 labor hours

  2. BA larger multi-site contractor

    Hand-entered punches and unrecorded time between sites

    120 people × 8 min ÷ 60 = 16 h a day × $52/h = $832 a day × 245 days

    $203,840a year · 3,920 labor hours

  3. CForemen and leads who split their day

    Time spent at a second job, coded to the first

    8 people × 45 min ÷ 60 = 6 h a day × $76/h = $456 a day × 240 days

    $109,440a year of labor charged to the wrong job · payroll unchanged

Based on these inputs; not measured losses or promised savings. Loaded rate = wage plus burden (taxes, insurance, benefits).

Where the value hides

Five places unclear hours hide on an ordinary timecard.

$39.69

average hourly wage in construction, before taxes, insurance and benefits are added.

Source: AGC and NCCER, 2025 Workforce Survey
  • Rounding

    Start and finish written to the nearest quarter or half hour. Each instance is small; it repeats every shift.

  • Punches entered by hand

    A late start or early finish written down as the scheduled time, often days later and in good faith.

  • Unallocated time between sites

    Drives and supply runs that land on no job, or on every job, depending on who filled in the sheet.

  • Misallocated job codes

    Hours paid correctly but charged to the wrong project, so one job looks cheaper than it was and another looks worse.

  • The office's own time

    Hours spent chasing missing sheets, interpreting handwriting and re-keying the week into payroll.

Investigate your records

Run two pay periods side by side and compare.

You don't need a consultant. You need two pay periods and something to compare the timecards against.

  1. 01

    Run a parallel period

    Keep your current timecards for one or two pay periods while badges record the same shifts.

    2 pay periods

  2. 02

    Compare day by day

    Line up entered start, finish and job against the badge-recorded day. Note the differences by type.

    Office

  3. 03

    Look for patterns, not people

    Group differences by site, crew and kind. A consistent gap usually points to a process, not a person.

    By site

  4. 04

    Fix the process

    Realistic scheduled starts, job codes set by location, supply runs on their own line. Then measure again.

    Ongoing

ZeroBadge AI

Ask ZeroBadge AI to size the gap in your own records

The arithmetic on this page uses your inputs. Once the badges are running, ZeroBadge AI can answer the same questions from your real records, with every number linked to the days behind it. It is read-only and finds patterns, not culprits.

  • You ask

    How many paid hours last month were not tied to a jobsite?

    640 of 6,200 paid hours, about 10%, were transit, supplier stops or time with no location reports. 190 of those hours had no location reports at all, and each one links to its day.

  • You ask

    How often did shifts start late or end early?

    Late starts on 58 of 612 worker-days and early finishes on 23, so 81 worker-days or 13%. Approved time off is left out of the count.

  • You ask

    Which crew has the most unverified time?

    The Elm Street crew, with 94 hours against 31 for Harbor Road. Most of it is stretches with no location reports, which lowers the record's confidence rather than pointing at a person.

Answers come only from your company's own records. Every number links to the records behind it. Read-only; admins control access.

How ZeroBadge AI works

Questions

Questions about unclear labor hours.

Is there an industry average for payroll leakage in construction or other field work?
Not one that holds up. Widely repeated percentages and national totals don't trace to a published study with a stated method. Estimate your own from crew size, loaded rate, working days and the minutes you can actually see in your records.
Does this mean my crews are padding their hours?
Usually not. Most differences come from rounding, writing times down later, and moving between sites with no good way to record it. Some of them leave workers underpaid. The aim is a clearer record for everyone, not suspicion.
How do I estimate the unclear hours for my own crew?
Compare one or two pay periods of your current timecards with an independent record of the same shifts, and take the typical difference per person per week. Until then, the calculator above starts from a fixed 3 hours per worker per week: set your crew size and loaded rate to see what that represents for you.
Will ZeroBadge reduce my labor costs?
ZeroBadge doesn't promise savings. It gives you badge-recorded hours by worker and jobsite, flags exceptions for review, and shows labor cost by job, so decisions start from the same record.

Get started

Put your own numbers next to your own records.

We'll walk through a parallel pay period: what the badge records, what the timecards say, and where they differ.

What we will walk through

  • 01Your crew size, rates and working days
  • 02How differences are grouped by site and type
  • 03What a parallel period looks like in practice